Set your start and end points and Snonav will instantly give you the best and quickest route.
Live in-ear audio instructions at every turn means no more stopping to look at the map.
Share your location or a meet-up location and let Snonav guide everyone there.
Set your preferences, plan your route, get in-ear turn-by-turn directions so you can navigate the mountain with ease and meet up with friends and family



Beyond statistics, the DSR 2017-18 captured a quieter revolution: the appointment of district-level quality monitors—retired PWD engineers paid by kilometer audited, not by day. One such monitor in Beed, interviewed in the review’s foreword, said: "For 30 years, I saw roads fail within one monsoon. Now, I fail the contractor before the monsoon starts."
The 2017-18 review was brutally honest about the hurdles:
This is the most referenced section. Rates are provided for:
| Item Description | Unit | DSR 2017-18 Rate (₹) Zone Pune | | --- | --- | --- | | P.C.C. 1:4:8 using 40mm aggregate | cum | 3,850 – 4,200 | | R.C.C. M20 (1:1.5:3) with OPC 43 grade | cum | 5,950 – 6,450 | | R.C.C. M25 with superplasticizer (for bridges) | cum | 6,800 – 7,350 |
Note: These rates excluded taxes. Contractors added GST @ 18% or applicable VAT/CST (for old stocks) as per transition rules.
The District Schedule of Rates (DSR) 2017-18 is a critical document published by the Public Works Department (PWD), Government of Maharashtra. It serves as the official rate analysis for various construction items, materials, and labor across all districts of the state.
Primary Objectives:
Note: This DSR was valid from April 1, 2017, to March 31, 2018 (FY 2017-18). It has since been superseded by DSR 2018-19, 2019-20, and later editions.
| Feature | Details | |--------|---------| | Authority | Chief Engineer (Administration), Public Works Department, Maharashtra State, Mumbai | | Base Year for Pricing | 2017 (market surveys conducted in Jan–June 2017) | | Coverage | All 36 districts of Maharashtra (separate rate schedules for each district) | | Structure | Volumes: Building Works, Road Works, Bridge Works, Water Supply & Sanitary Works, Electrical Works | | Update Cycle | Annual (but DSR 2017-18 was a significant revision after DSR 2015-16) | | Applicability | All state government civil contracts, Zilla Parishad works, Municipal Corporation works (by adoption) | pwd dsr 2017-18 maharashtra
The PWD DSR 2017-18 for Maharashtra is not an exciting read—it is a necessary one. It reminds us that behind every seamless journey from Mumbai to Solapur, behind every new district hospital’s concrete pillar, lies a statistical review that held someone accountable.
As Maharashtra dreams of expressways to Goa and a ring road around every city, the lessons of 2017-18—on maintenance, quality, and equitable distribution—remain etched in its dusty, dog-eared pages.
“The road of progress is measured not in kilometers, but in audits.”
The Detailed Schedule of Rates (DSR) for the Maharashtra Public Works Department (PWD) for the year 2017-18 is a critical document used for estimating construction costs for government projects. It provides standardized rates for materials, labour, and machinery. Key Documents & Links
State e-DSR 2017-18: This document contains the finalized rates for road, bridge, and building works effective from June 14, 2017. You can view or download it via unofficial sources like Scribd - Maharashtra e-DSR 2017-18.
PWD Material Rates 2017-18: A specific breakdown of unit costs for materials such as cement, steel, and paint. A reference copy is available at Scribd - Maharashtra PWD Material Rates.
Common Schedule of Rates (CSR) 2017-18: Often used by the Water Resources Department (WRD) and other regional bodies for specialized infrastructure. Official PDFs can be found on the Maharashtra WRD Publication Portal.
Electrical DSR 2017-18: Specific rates for electrical fixtures, street lighting, and cabling. Major Categories Covered Beyond statistics, the DSR 2017-18 captured a quieter
The 2017-18 DSR is divided into chapters to facilitate organized cost estimation:
Road Works: Includes road surveys, sub-grades, surfacing courses, and maintenance.
Bridge Works: Covers sub-structures, bearings, super-structures, and bored piles.
Building Works: Encompasses excavation, structural steel, RCC work, masonry, plastering, flooring, and painting.
Electrical & Mechanical: Specialized rates for power installations and infrastructure. Post-GST Implementation
A significant update in 2017 was the implementation of GST (Goods and Services Tax). For tenders issued after July 1, 2017, the e-DSR rates were adjusted to account for the extra burden of GST, which was often compensated as a variation in rates approved at the Superintending Engineer level. Maharashtra PWD Schedule of Rates 2017-18 | PDF - Scribd
The District Schedule of Rates (DSR) for 2017–18 in Maharashtra, issued by the Public Works Department (PWD), became operative on September 22, 2017. It provides a standardized framework for estimating the costs of various civil and electrical works across all districts of the state. Key General Provisions
Regional Adjustments: Basic item rates are subject to percentage increases depending on the specific work location: Corporation Areas: 5% increase Municipal Council Areas: 4% increase | Item Description | Unit | DSR 2017-18
Mumbai Specific Works: 5% increase (e.g., Mantralaya, Police Mukhyalaya)
Special Zones: Increases also apply to notified tribal areas, hilly inaccessible regions, and coal/lime mining areas.
Machinery vs. Manual: Specified rates often distinguish between work performed manually and work executed by machinery. For example, manual lift charges by head load are explicitly defined and are not applicable to machine-led work.
Standard Specifications: All items must follow the PWD standard specifications; for electrical works, the "Specifications for Electrical Works 2008" (amended) apply. Basic Material Rates (Sample)
The 2017–18 DSR was calculated based on these foundational material costs: Cement: ~₹4,200 per M.T. TMT-FE-500 Reinforcement: ~₹33,425 per M.T. Structural Steel: ~₹34,834 per M.T. Corrosion Resistant Steel: ~₹35,975 per M.T.
Bitumen (Bulk VG 30): Approximately ₹31,317 per M.T. (based on period context). Labor Rates (Per Day) Standard daily rates for labor included: Civil Engineer: ₹939.00 CAD Operator / Assistant: ₹581.00 Mason / Carpenter / Fitter: ₹494.00 Mazdoor (Heavy): ₹467.00 Mazdoor (Light): ₹448.00 Categorization of Works The schedule is divided into chapters covering: GOVERNMENT OF MAHARASHTRA
Consider a village road project in Beed district (Zone IV – Marathwada) sanctioned in December 2017. An engineer would:
The final estimated cost forms the tender value.