Rates 2018-19 Karnataka Pdf | Pwd Schedule Of

A: Yes. Arbitration tribunals frequently use the SoR of the contract year (2018-19) plus a prescribed escalation index (specific to Karnataka PWD) to calculate current due amounts.

If you are preparing a bid for a legacy project or a maintenance contract that refers to the "Karnataka PWD SoR 2018-19," follow this protocol:

Unlike Central PWD (CPWD) documents, Karnataka PWD does not always keep very old SoRs easily accessible on their main homepage. However, the authentic digital copies are maintained on the official Karnataka PWD e-Procurement Portal and the Karnataka Government Data Centre.

Step-by-Step Download Guide:

Disclaimer: Direct third-party hosting of government PDFs is illegal. Always verify you are downloading a PDF file ending in .gov.in.

If the official link is temporarily moved, look for the file name convention: Typically, the file is named SoR_2018-19_KPWD.pdf or Rate_Analysis_2018_Karnataka.pdf.

This is the tabular data most people search for. Each item has a unique code, description, unit, and total rate (₹). Examples include:

| Item Code | Description | Unit | Rate 2018-19 (₹) | | :--- | :--- | :--- | :--- | | 101 | Earthwork excavation in ordinary soil | cum | 180.00 | | 804 | Providing and laying reinforced cement concrete (M20 grade) | cum | 5,250.00 | | 1201 | Plastering with cement mortar (1:6) – 12mm thick | sqm | 98.00 | | 2531 | Providing vitrified tiles (Flooring) | sqm | 520.00 |

Note: The above rates are illustrative. The actual PDF contains hundreds of items, including road work (bitumen, WMM), bridge works (piling), and sanitary fittings. pwd schedule of rates 2018-19 karnataka pdf

  • Format: Usually organized by work categories with unit descriptions, unit of measure, and rate (often in INR per unit). PDF includes tables and may reference standard specifications and drawings.
  • Why 2018-19 matters: It was the reference year for estimates and contracts during that fiscal period; rates reflect market conditions then and are used for retrospective billing or arbitration of disputes for projects from that period.
  • How to interpret: Check the item code and description, units, and whether rates include GST (and other taxes) or are exclusive—also verify any departmental circulars revising rates after publication.
  • Common pitfalls: using outdated rates without applying escalation/adjustments, ignoring local site conditions or special specifications, and not accounting for subsequent corrigenda or departmental circulars.
  • Where to find the PDF: Typically available from Karnataka PWD / Government engineering department websites, state e-procurement portals, or as attachments to tender documents.
  • If you want, I can:

    Which would you like?

    The Karnataka Public Works Department (KPWD) Schedule of Rates (SR) for 2018-19 serves as the official benchmark for estimating costs in government construction projects across the state. This document is essential for contractors and engineers to determine standardized pricing for materials, labor, and machinery. Key Highlights of the 2018-19 Schedule

    Base Specifications: The 2018-19 SR largely retained the technical specifications from the 2016-17 version but updated the unit rates to reflect market changes.

    Interest Rate Reduction: A significant administrative change was the reduction of the interest rate on capital cost from 11% to 9%.

    Variable Dearness Allowance (VDA): Labor rates were adjusted based on a VDA of approximately ₹61.00 per day, calculated from the 2017 state average consumer price index for industrial workers. Standardized Material Costs:

    Cement: Fixed at approximately ₹4,879 per MT (roughly ₹244 per bag).

    Steel (TMT): Fixed at approximately ₹45,616 per MT for general PWD works. A: Yes

    M-Sand: Use of Manufactured Sand (M-Sand) was actively encouraged over river sand to meet environmental guidelines. Typical Rates for Construction Materials (2018-19) Material Item Rate (Approx. ₹) Cement (43 Grade) Reinforcement Steel Manufactured Sand (M-Sand) Cubic Meter Coarse Aggregate (20mm) Cubic Meter Burnt Bricks (1000 Nos) Bitumen (80/100 Grade)

    Data sourced from Scribd PWD SR 2018-19 and KBJNL Official Documents. Usage Notes for Estimates

    GST Exclusion: Most rates listed in the SR are exclusive of GST. For contracts during this period, GST (typically 12%) was added separately to the final estimate.

    Overheads & Profit: Estimates typically include 10% for Contractor’s Profit and 10% for Overhead Charges.

    Area Weightage: Specific circles (e.g., Dharwad, Bangalore, Shimoga) may have slight variations or "area weightages" for transport and local conditions. Download Resources 2018-2019 SR Bangalore | PDF - Scribd

    Karnataka Public Works Department (PWD) Schedule of Rates (SR) 2018-19

    is a vital regulatory and technical document that standardizes the cost of construction materials, labor, and machinery usage across public works in the state. By providing a fixed baseline for estimation, it ensures transparency, fiscal responsibility, and uniformity in government infrastructure projects. Purpose and Scope

    The primary function of the SR 2018-19 is to serve as a comprehensive reference for engineers and contractors to prepare detailed estimates for projects such as buildings, roads, bridges, and water resources. The 2018-19 edition specifically updated rates from previous years to reflect then-current market conditions, including: Minimum Wages : Updated based on state labor department notifications. Material Costs Disclaimer: Direct third-party hosting of government PDFs is

    : Revised for key commodities like cement, steel, and aggregates. Machinery Hire

    : Calculated using Capital Cost variations and Wholesale Price Index (WPI) data from 2015-18. Key Components of the Document

    The schedule is typically divided into several volumes or chapters to cover diverse engineering needs: Standard Specifications

    : Often based on CPWD (Central Public Works Department) or MoRTH (Ministry of Road Transport and Highways) standards to ensure quality. Rate Analysis

    : Detailed breakdowns of how finished rates are derived, including costs for raw materials, labor charges, and machinery usage. General Notes

    : Crucial instructions on "lead and lift" charges (transportation costs), royalties, and taxes like GST (though specific material rates were often listed exclusive of GST). Significance in Governance

    By mandating a uniform rate structure, the Karnataka PWD minimizes discrepancies in project bidding. It prevents overvaluation in government contracts and provides a legal framework for auditing public expenditures. For contractors, the SR 2018-19 acted as a predictable roadmap for resource allocation, ensuring that bids remain competitive and grounded in realistic state-verified data.

    Public Works Department Schedule of Rates for Buildings 2023

    While the main SSOR (Standard Schedule of Rates) is for the whole state, the 2018-19 PDF also included annexures for DSR to account for transportation variations.