Tower Crane Dismantling Method Statement May 2026
The dismantling of a tower crane is arguably the most dangerous phase of its lifecycle. While erection attracts attention for its dramatic height increases, dismantling involves working at maximum height with partially disassembled components, often in tight urban environments. A Tower Crane Dismantling Method Statement is not just a paperwork exercise; it is a critical risk control document that dictates the safe, logical, and efficient reversal of the erection process.
This article provides a detailed template and explanation of a professional method statement, covering planning, roles, equipment, step-by-step procedures, and emergency protocols.
Using the auxiliary mobile crane.
Critical: Never stand under the jib during pin removal. Use tag lines.
| Name | Role | Signature | Date | |------|------|-----------|------| | [Name] | Appointed Person | | | | [Name] | Site Manager | | | | [Name] | Safety Officer | | | tower crane dismantling method statement
For practical use, a tower crane dismantling method statement should include this table format on the first page:
| Project Name: | XYZ High-Rise | |------------------|----------------| | Crane Model: | Potain MD 560 | | Dismantling Date: | 15 Nov 2025 | | Appointed Person: | J. Smith | | Mobile Crane: | Liebherr LTM 1160 (160t) | | Weather Limit: | Wind < 20 mph, no precip | | Sequence Step | Responsible | PPE | Permit Required | | 1. Site setup | Supervisor | HV, Gloves | Exclusion zone | | 2. Jib dismantle | Rigger A | Harness, radio | Lift plan | | 3. Counter-jib | Rigger B | Harness | Lift plan | | … | … | … | … | | Emergency contact: | Site security: 555-0199 || The dismantling of a tower crane is arguably
After the last component is on the ground: